The most important factor in choosing a custom builder is the building process. We take our clients step-by-step through the custom homebuilding process and make sure they know what to expect along the way.

DESIGN

We will begin by meeting with you to discuss your vision for the new home and then present a budget.

FINANCING

We understand that the financial component of a construction loan can be challenging. That is why we, along with our lender partners, will help you decide what financing option is best for your family and budget.

PLANS & PERMITTING

After we have executed our purchase agreement, we will finish your building blueprints, and engineering, then submit everything to obtain a building permit.

BUILDING

Now it is time to break ground and begin the construction of your dream home. As it becomes a reality, we will work to make sure every stage of construction is completed with the highest level of quality & expertise.

WARRANTY

One of the most valuable aspects of buying a new home is its warranty. We have several warranty programs we offer to our clients.

As a member of the 2-10 Home Warranty Program, we offer a 1-year builder warranty, a 2-year mechanical warranty, and a 10-year structural warranty for one reason.

Steps To Bringing Your Dream Home Into Reality!

There are many steps to building a house, from pouring the foundation to framing to choosing your paint colors. Below we have outlined Mutimer Custom Homes’ process of building a house, so you’ll know what to expect each step of the way.

Building Site Preparation

Once we have acquired the appropriate permits, the first step in building a house is to prepare the land. During building site preparation, our crew will clear the lot of rocks, debris, or trees. Their goal is to level the site prior to pouring the foundation.

Pouring the Foundation

Next, we will pour the foundation. Foundations are typically built on slabs, basements, or crawl spaces. They often consist of poured concrete with steel rods. 

Framing

During this step, we will install walls, windows, and doors, as well as the floor and roof systems. What’s known as the skeleton of your new house is starting to take shape! We will install a protective house wrap shield, to prevent moisture from affecting the structure, keeping mold and wood rot at bay.

Setting Up Plumbing, Electrical, & HVAC

Once the house is considered “dried in” (i.e., covered with the house wrap), it’s time to move to plumbing, electrical, and HVAC systems. After they’re installed, an inspector will approve your pipes, electrical wiring, and heating and cooling ducts.

Adding Insulation

Adding insulation is an important step for controlling a house’s temperature and keeping cooling and heating costs low. Foam, fiberglass, and cellulose are common insulation materials. We will typically insulate exterior walls, and areas around a basement, crawl spaces, and attic.

Adding Drywall

Once the drywall goes up, your house’s interior will begin to look complete. We will hang drywall and cover any raised surfaces, like seams or nails, with a spackling compound.

Interior Finishes

Once the drywall is in place, your builder will focus on interior finishes, such as the fireplace, mantle, internal doors and window sills, and decorative trim. This is the time that we begin to bring in the paint and wall features such as tile. 

Exterior Finishes

Driveways, walkways, and patios are next! Things are starting to take shape outside your new home too. We will complete exterior grading to ensure proper drainage away from the house and make sure your new yard is coming along nicely.

Installing Fixtures

In this step, we will install fixtures, such as light switches and faucets. You’ll also see your toilets and sinks added. Your HVAC system is now complete.

Installing Flooring

Next, we will install either hardwood flooring or carpets. When making your selections, consider which is right for you in each room of your home. 

Inspection

A building code official completes a final inspection and issues a certificate of occupancy. If any defects are found during this inspection, a follow-up inspection may be scheduled to ensure that they’ve been corrected. This can sometimes take up to a week

Final Walkthrough

Your dream home is ready! Once construction and inspections have been completed, we will walk you through your new home to acquaint you with its features and the operation of various systems and components and explain your responsibilities for maintenance and upkeep, as well as warranty coverage and procedures. Once the Certificate of Occupancy is issued by the local municipality, and the lender issues the final funds, you’re ready to move in!

60-Day Warranty Check-Up

Sixty days after we deliver keys to your new home, we’ll perform a 60-day Warranty Check-Up to ensure everything in the home is performing as intended

11-Month Warranty Check-Up

11 months into your 1-year builder warranty, we will once again check in to make sure everything is working as it should be, and explain the process for the remainder of your warranty.